I need to have the main graph containing 3 data lines and Then three separate graphs one line in each of them.
So, the main graph with A, B, C lines together. And A line graph, B line graph, C line graph - one line per graph.
Thanks, that helped indeed. but there is an issue.
Is there a way to update multiple charts? I cannot call multiple setExtremes inside one afterSetExtremes to update multiple charts.
I have a Stockchart and a few Highcharts. The stock chart has its own default date picker. When I update date range in the Stock chart, another Highchart should be updated with it.
How can I apply selected date range in the Stockchart to another highchart?